After a few meetings with Bill and his kids and an afternoon spent auditing the trees on Bill’s property, Dustin began the design process, which as usual, started with his sketchbook and ended with his MacBook. The final result: a scale computer render of the final structure.

During the construction phase, the structures were fully built on ground, before being labeled, deconstructed and rebuilt in the trees. 
One hiccup in this process occurred as they were trying to fit the smaller structure into its tree.
The tree had several branches that collided exactly with the edge of the structure’s floor, an issue that Dustin knew would arise during the build, but also knew was a problem best solved in action, rather than during the planning phase. The issue was solved by cutting slightly into the edge of the pie-shaped floor and its supporting beam, the team being very careful not to alter the integrity and strength of the overall structure while doing so.
The project was thus finished on time in mid-November 2008, complete with zipline cart and rope swing to the delight of Bill and his children, who got promptly to play!
The rope swing in action!!
Notes: Word about the Lotus Build quickly spread through the hot L.A.“green scene” and Dustin was invited to be a guest on KTLA’s weekly green segment (KTLA is a local Los Angeles news network.) The KTLA crew came out to Bill’s property to film the structures and chat with Dustin about the Lotus Build, O2 Treehouse, sustainable design, and more! You can view the full interview here on KTLA's website.
The treehouse crew for the Lotus Build included Josh McKevitt, Carlos Luna-Perez, and Jamin Poulos. All crew members were integral parts of the building process, without whom this project could not have been successfully completed.